Answer:
table A
Step-by-step explanation:
side note: if the outputs have the same numbers there not a function
Answer:
(a). 72.9%.
(b). 13.6 hr.
Step-by-step explanation:
So, we are given the following data or parameters or information which is going to assist us in solving this question/problem;
=> "A welder produces 7 welded assemblies during the first day on a new job, and the seventh assembly takes 45 minutes (unit time). "
=> The worker produces 10 welded assemblies on the second day, and the 10th assembly on the second day takes 30 minutes"
So, we will be making use of the Crawford learning curve model.
T(7) + 10 = T (17) = 30 min.
T(7) = T1(7)^b = 45.
T(17 ) = T1(17)^b = 30.
(T1) = 45/7^b = 30/17^b.
45/30 = 7^b/17^b = (7/17)^b.
1.5 = (0.41177)^b.
ln 1.5 = b ln 0.41177.
0.40547 = -0.8873 b.
b = - 0.45696.
=> 2^ -0.45696 = 0.7285.
= 72.9%.
(b). T1= 45/7^ - 045696 = 109.5 hr.
V(TT)(17) = 109.5 {(17.51^ - 0.45696 – 0.51^ - 0.45696) / (1 - 0.45696)} .
V(TT) (17) = 109.5 {(4.7317 - 0.6863) / 0.54304} .
= 815.7 min .
= 13.595 hr.
The first answer of the missing blank is 4/5.
The second answer of the missing blank is 2.
The third answer of the missing blank is 25.
*For all of these solutions, I will be using the common rules for logarithms.*
Solution for the first question:
Log9^4/5 must equal log9^4-log9^5, or it could also equal the more proper version, which is simplified: 2log9^2-log9^5.
Solution for the second question:
Log3^22 must equal log3^11+log3^2, if you break it down.
Solution for the third question:
Log9^25 must equal 2log9^5 because it will be like this when simplifying it:
log9^25=2log9^5
log9^5²=2log9^5
2log9^5=2log9^5
These are all of the step-by-step procedures for all three of these given questions. Anyways, I hope that this helped you!
Step-by-step explanation:
First multiply
9w - 18 = - 18
9w = - 18 + 18
9w = 0
w = 0 / 9 = 0
w = 0
Answer:the original price is $680
Step-by-step explanation:
1/4(x)=170
4×1/4(x)=4×170
x=$680