Steps:
5.15*1.09*12 = total
5.6135*12 = total
$67.36= total
Answer: $67.36
Answer:
Due to the higher Z-score, Demetria should be offered the job.
Step-by-step explanation:
Z-score:
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
In this question:
Whichever applicant had grade with the highest z-score should be offered the job.
Demetria got a score of 85.1; this version has a mean of 61.1 and a standard deviation of 12.
For Demetria, we have
. So



Vincent got a score of 299.2; this version has a mean of 264 and a standard deviation of 22.
For Vincent, we have
.



Tobias got a score of 7.26; this version has a mean of 7.1 and a standard deviation of 0.4.
For Tobias, we have
.



Due to the higher Z-score, Demetria should be offered the job.
I don’t know if you meant 7 hours or 7 1/2 hours, but if it was in 7 hours, the answer would be around 15 square feet. If it was 7 1/2 hours, it would be 14 square feet.
Answer:
x=w-z
add x to both sides w=z+x
subtract z from both sides w-z=x
Answer:
B, C
Step-by-step explanation:
that's the answerrr