Answer & Explanation:
It will be most appropriate to assign the patient to a room with roommate having the same MRSA case in the urine and importantly the roommate is not bedridden, that is, the he or she is ambulant
Answer:
The answer is A. Loperamide
Explanation:
Antidiarrheals are drugs which are given to treat acute diarrhea by providing symptomatic relief for diarrhea but do not eliminate the cause of the diarrhea.The most common drug used is Loperamide (Imodium) which is an opioid receptor agonist. Loperamide decreases the flow of fluids and electrolytes in the bowel and reduces bowel movement by acting on the mu opioid receptors in the myenteric plexus of the large intestine. However, when taken in large quantities it gives high euphoria similar to opioids.
1.- Institutional contingency planning, provides a general reference for humanitarian action, based on the mandate, policies, strategies, criteria and international and the intitution standards.2.-Analysis of hazards, vulnerability, capacity and the risks, adequate contingency planning should be based on the analysis of the risks that run the health center.3.-Determination and mobilization of resources, it is essential that the information about the capacity and resources is accurate and reliable, since this way the deficiencies and gaps can be determined and the use of existing resources optimized.4.- Early warning, warning systems and triggering factors. The contingency response planning process should establish the way to alert employees, and designate those responsible for notifying the others concerned.5.-Agreement and communication, the medical establishment should establish information management procedures within their contingency plans.6.-Sectoral responsibilities. Contingency plans must include a brief description of how they will address the needs in the different departments and the distribution of functions and responsibilities.7.-Salvage and health care, equipment formed to attend to any case of victims.8.- Announce the start and possible end dates of the contingency plan.9.- Recovery plan if needed.10.- The periodic revision of the contingency plan, to ensure that it is underway and does not need any change.