Using the normal distribution, it is found that a production worker has to make $542.64 a week to be in the top 30% of wage earners.
<h3>Normal Probability Distribution</h3>
In a normal distribution with mean
and standard deviation
, the z-score of a measure X is given by:

- It measures how many standard deviations the measure is from the mean.
- After finding the z-score, we look at the z-score table and find the p-value associated with this z-score, which is the percentile of X.
In this problem:
- The mean is of
.
- The standard deviation is of
.
- The lower bound of the top 30% is the 70th percentile, which is X when Z has a p-value of 0.7, so <u>X when Z = 0.84.</u>




A production worker has to make $542.64 a week to be in the top 30% of wage earners.
You can learn more about the normal distribution at brainly.com/question/24663213
If we're talking about a box with dimensions 10 ft, 19 ft and 20 ft, it's probable that the instructions say to calculate the volume. That would be
V = (10 ft)(19 ft)(20 ft) = 3800 cubic feet.
Answer:
55/200 in percentage is 27.5 percent
So answer is 27.5
Answer:
1) 4 2)1/5 X=10
Step-by-step explanation:
Small to large is a fraction
Large to small is a whole number
M*10-m*2=8
10m-2m=8
8m=8
Divide both sides by 8:
m=8
Fill in the m's:
1*10-1*2=8
10-2=8
8=8
Hope this helps :)