<span>B.) It is a straight line joining the points (0, −2), (2, 1), and (−2, −5).
[ It is because x- & y-coordinates are valid in this situation ]
Hope this helps!</span>
We are given a scale that for every 1 in on the plan, the actual length will 6.5 ft.
The maximum distance across the pond on the plan is 9.75 in. So that means we will need to take 6.5 ft 9.75 times. So our answer is
6.5*9.75=63.375 ft. That's the answer.
We can visualize this a different way
1 in = 6.5 ft
9.75 in = x ft
And from here it's a little more clear to see what needs to be done.
Hope this helped!
Let's represent h with the number of hours:
15h ≥ 200
h ≥ 200/15
h ≥ 40/3
h ≥ 13 1/3
He has to work at least 13 1/3 hours.
Answer:
Angle ACB And Angle ECD
Step-by-step explanation:
Answer:
c=256
Step-by-step explanation:
m²+32m+c=m²+32m+(32/2)²-(32/2)²+c
=m²+32m+16²-16²+c
=(m+16)²-256+c
for it to be a complete square -256+c=0
or c=256