The cost of hiring a car for 2 days in 2013 is Rs. 316.8
<h3>How to find the cost of hiring in 2013 ?</h3>
The cost for hiring a car for 2 days in 2018 was Rs. 264 which was 20% more than in 2013.
Therefore,
cost of hiring for 2018 = Rs. 264
Therefore,
let
cost of hiring in 2013 = 20%(264) + 264
cost of hiring in 2013 = 20 / 100 × 264 + 264
cost of hiring in 2013 = 1 / 5 × 264 + 264
cost of hiring in 2013 = 264 / 5 + 264
cost of hiring in 2013 = 52.8 + 264
cost of hiring in 2013 = 316.8
Therefore, the cost of hiring a car for 2 days in 2013 is Rs. 316.8.
learn more on cost here: brainly.com/question/1663590
#SPJ1
1. since the equations equal each other
2x+19=x+7
-x -x
x+19=7
-19 -19
x= -12
sub into y= x+7
y= -12+7
y= -5
2. x+2y=-7
<span>x+y+23=0
i don't know what the second equation is equal to, i'll assume 0
2y=x-7
y=1/2x-7/2
sub this into x+y+23=0
x+1/2x-7/2+23=0
3/2x+39/2=0
-39/2 -39/2
3/2x= -39/2
x=-39/2 / 3/2
x= -13
sub into y=1/2x-7/2
y=1/2(-13)-7/2
y= -10
3. </span>x+5y=2
<span>x=-4y+5
</span>sub x=-4y+5 into x+5y=2
-4y+5+5y=2
y+5=2
-5 -5
y= -3
sub y =-3 into x =-4y+5
x=-4(-3)+5
x= 17
4. 3x+y=9
<span>y=-5x+9
</span>sub -5x+9 into 3x+y=9
3x+(-5x+9)=9
3x-5x+9=9
-2x+9=9
-9 -9
-2x=0
x=0
sub into y=-5x+9
y=-5(0)+9
y=9
M = ( (-6+4)/2, (3+-2)/2 )
M = (-1, 1/2)
Answer:
No
Step-by-step explanation:
Plug in the x and y values and you should get 3<9
<h2><em><u>
**Please rate 5 give thanks and vote brainliest**</u></em></h2>