1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
IgorLugansk [536]
3 years ago
6

Choose the answer that correctly solves the equation: 6 x 4 + 3 = ?

Mathematics
2 answers:
BlackZzzverrR [31]3 years ago
4 0

Answer:

27

Step-by-step explanation:

because 6×4 is 24 and 24+3 =27

Zepler [3.9K]3 years ago
3 0

Answer:

The answer is 27

Step-by-step explanation:

Using Pemdas (Parentheses, Exponents, Multiplication, Division, Addition, Subtraction) 6 x 4= 24 then 24 + 3= 27.

Hope this helps. Please name me Brainliest

You might be interested in
The width of a rectangle is shown below: A coordinate plane with a point A at negative 3, 3 and C at negative 3, negative 2. If
Tanzania [10]
It should be d I think
8 0
3 years ago
Find Y
djverab [1.8K]

Answer:

\sin(30)  =  \frac{y}{2 \sqrt{2} }  \\  \\  <  =  >  \frac{1}{2}  =  \frac{y}{2 \sqrt{2} }  \\  <  =  > y =  \frac{2 \sqrt{2} }{2}  \\  \\  <  =  > y =  \sqrt{2}

8 0
3 years ago
Read 2 more answers
Use the image to answer the question.
Nonamiya [84]
Insert a picture on the question bc there is no image
7 0
3 years ago
How many numbers are equal to the sum of two odd, one digit numbers
Paul [167]
Here is a list of the odd number paired

1+3, 1+5, !+7, and !+9  (there are 4 unique sums - 4, 6,8 and 10)
3+5, 3+7, 3+9  (notice I did not pair 3 with 1 and the the only new sum is 12)
5+7, 5+9  (the only new sum is 14)
7+9  (16 is a new sum)

The sums (no repeats) are 4,6,8,10,12,14 and 16 for a total of seven numbers.
5 0
3 years ago
An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/ho
Sindrei [870]

Answer: 8 minimum work stations is what would be needed.

Step-by-step explanation:

The cycle time is computed as the operating time daily divided by the scheduled output.

It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.

Therefore,

If you need to produce 30units/hour.

The average cycle time is as follow:

The average cycle time is the average time between the completions of units.

60/30= 2 average cycle time

=16/2

=8

8 work stations is the minimum number that would be needed.

It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.

5 0
3 years ago
Other questions:
  • Lupita rides a taxi that charges a flat rate of $6.75 plus $3.20 per mile. If the taxi charges Lupita $40.03 in total for her tr
    5·2 answers
  • What is the solution to this system of equations? 3x + y = 17 x + 2y = 49
    12·1 answer
  • Find the domain of the function. (Enter your answer using interval notation.)
    15·1 answer
  • Solve and graph the inequality on a number line -19&gt;g-24
    6·1 answer
  • Please, PLEASE help me! It’s due today! Please answer it properly! I’ll give Brainliest if the answer is correct, thank you In a
    5·1 answer
  • A baker is filling an order which consists of loaves of bread, bags of rolls, and small boxes of croissants. She includes 8 of e
    6·1 answer
  • A researcher designs an experiment by manipulating the following variables: temperature (low or high), illumination level (low o
    11·1 answer
  • Mr. Lim is building a deck. He cuts a 9 foot piece of wood into
    10·1 answer
  • How do you solve 3b(9b-27)=0
    10·2 answers
  • Opposite reciprocal of -9/1 and 11/-7
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!