Using a system of equations, it is found that since 20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.
<h3>What is a system of equations?</h3>
A system of equations is when two or more variables are related, and equations are built to find the values of each variable.
In this problem, the variables are:
- Variable c: number of child bikes.
- Variable a: number of adult bikes.
Each child bike requires 4 hours to build, as do each adult bike. The company has 100 hours of testing, hence:
4c + 4a = 100.
c + a = 25.
With 20 child bikes and 6 adult bikes in a week, we have that c = 20, a = 26, hence:
c + a = 26
20 child bikes and 6 adult bikes would require more testing than the allocated time, it is not possible to build this amount.
More can be learned about a system of equations at brainly.com/question/24342899
#SPJ1
Answer:
I think it's C, I may be wrong though
Step-by-step explanation:
Answer:
121
Step-by-step explanation:
The missing number is 121. I got this by doing 764-130-513=121. You would do this because you are trying to find the number that would allow 130 and 513 to add up to 764.
Another way to look at this problem is 513+130= 643
764-643=121
In conclusion, 513+121+130=764
Answer:
288
Step-by-step explanation:
I’m not 100% sure yho