Answer:
List all of the solutions.
50
k
m
=
9
m
i
n
u
t
e
s
=
14
k
m
=
Step-by-step explanation:
The answer to your question is $720
Answer: Is reinforced with other material
Step-by-step explanation:
The options are:
A is expensive to build.
B usually cracks under heavy weights.
C looks like any other road.
D is reinforced with other material.
The passage best supports the statement that a concrete road are reinforced with other material. According to the information given in the passage, steel plays a vital role in keeping the road surface flat.
Steel bars are embedded in concrete so that the stresses cannot crack the slab. Therefore, it indicates that concrete road is reinforced with other material.
Part (a)
There are 7 red out of 7+3 = 10 total
<h3>Answer: 7/10</h3>
==========================================================
Part (b)
We have 3 green out of 10 total
<h3>Answer: 3/10</h3>
==========================================================
Part (c)
3/10 is the probability of getting green on any selection. This is because we put the first selection back (or it is replaced with an identical copy)
So (3/10)*(3/10) = 9/100 is the probability of getting two green in a row.
<h3>Answer: 9/100</h3>
==========================================================
Part (d)
Similar to part (c) we have 7/10 as the probability of getting red on each independent selection.
(7/10)*(7/10) = 49/100
<h3>Answer: 49/100</h3>
==========================================================
Part (e)
7/10 is the probability of getting red and 3/10 is the probability of getting green. Each selection is independent of any others.
(7/10)*(3/10) = 21/100
<h3>Answer: 21/100</h3>
==========================================================
Part (f)
We have the exact same set up as part (e). Notice how (7/10)*(3/10) is the same as (3/10)*(7/10).
<h3>Answer: 21/100</h3>