Answer:
The answer is explained below
Step-by-step explanation:
The steps to prioritize the mission with a scoring version are as follows:
Collection: This step consists of collecting and collecting all of the details associated with the mission.
Classification: This step consists of prioritization of the challenge based on a category method.
Verification: This step includes approval and verification of all classified projects.
They are then carried out in this order because these steps make certain safety, connectivity, integrity, cost-effectiveness, and right challenge implementation. Each step depends on the previous step. They are connected to every other; therefore, they are carried out in a particular sequence.
1. m = -5/2
2. b = 15
3. y = -5/2x + 15
22/36 simplified is 11/18. I hope this helps. Tell me if you need an explanation! : )
Answer:
8
Step-by-step explanation:
The diagram shows 8 different endpoints, so there are 8 different possible outcomes.
You can list all outcomes:
HHH
HHT
HTH
HTT
THH
THT
TTH
TTT
where H - head, T - tail