1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
FrozenT [24]
3 years ago
10

Zoro Manufacturing Company manufacturers wooden picture frames. Each piece of wood yields 15 frames. Each piece of wood costs $1

8.75. The direct labor charge is $13.50 per hour. Each hour, 65 frames can be produced. To the nearest cent, what is the prime cost of manufacturing one picture frame?
Mathematics
1 answer:
sesenic [268]3 years ago
6 0
To determine the cost of manufacturing one picture frame, add all the known cost by the number of frames produced. With the basis of one hour of operation,

                                  Cost of wood per frame = $18.75 / 15 = $1.25

                           Cost of direct labor per frame = $ 13.50 / 65 = $ 0.21

Adding all up the costs, 

                                     total cost = $1.25 + $0.21 = $1.46

Therefore, manufacturing one picture frame costs approximately $1.46. 
You might be interested in
Daniel created an intersection with his race track. One of the angles at the intersection is 55°. What are the three other angle
melomori [17]

Answer:

55, 125 and 125

Step-by-step explanation:

In this question, we are asked to find the other 3 angles in an intersection.

Please check attachment for what the diagram of the intersection might look like.

The intersection consists simply of 4 angles meeting at a point with the 2 angles on each side vertically opposite to the angles on the other side.

since one of the angles is 55, and we are having a straight line, the other angle would be 180-55 = 125.[ sum of angles on a straight line is 180]

These two angles are vertically opposite, this means that the other three angles are 55,125 and 125.

3 0
3 years ago
27 + 5 x 6 A Little Problem With this so some help please?
Kay [80]

Answer:

57

Step-by-step explanation:

1) According to PEMDAS, <em>multiply </em>first: 27+ 5x6= 27+30

2) Then <em>add</em>: 27+30=57

3 0
3 years ago
Read 2 more answers
Two different cars each depreciate to 60% of their respective original values. The first car depreciates at an annual rate of
Eddi Din [679]

Answer: A) 1.7 Years

Step-by-step explanation:

8 0
3 years ago
Read 2 more answers
What is the perimeter of a square whose diagonal is 3 square root 2? Show all work on how you got your answer
Alika [10]

Answer:

12

Step-by-step explanation:

Given: Diagonal of square= 3\sqrt{2}

To find the perimeter of square, we need to find the length of sides of square.

∴ Using the formula of diagonal to find side of square.

Formula; Diagonal= s\sqrt{2}

Where, s is side of square.

⇒ 3\sqrt{2} = s\sqrt{2}

Dividing both side by √2

⇒s= \frac{3\sqrt{2} }{\sqrt{2} }

∴s= 3

Hence, Length of side of square is 3.

Now, finding the perimeter of square.

Formula; Perimeter= 4s

⇒Perimeter= 4\times 3

∴ Perimeter= 12

Hence, Perimeter of square is 12.

6 0
3 years ago
Assume that women have heights that are normally distributed with a mean of 63.6 inches and a standard deviation of 2.5 inches.
Maurinko [17]

Answer:

Q3 = 65.7825.

Step-by-step explanation:

Problems of normally distributed samples are solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.

In this problem, we have that:

\mu = 63.6, \sigma = 2.5

Find the value of the quartile Q3. (Hint: Q3 has an area of 0.75 to its left.)

This is the value of X when Z has a pvalue of 0.75. So it is X when Z = 0.675.

Z = \frac{X - \mu}{\sigma}

0.675 = \frac{X - 63.6}{2.5}

X - 63.6 = 0.675*2.5

X = 65.7825

Q3 = 65.7825.

3 0
3 years ago
Other questions:
  • What is bed? because I need help I don't know what the answer is
    6·1 answer
  • The graph represents function 1 and the equation represents function 2: A graph with numbers 0 to 4 on the x-axis and y-axis at
    9·2 answers
  • Name a pair of vertical angles (there may be more than one choice)
    9·1 answer
  • Stacy bought a skateboard at a local sporting goods store. The skateboard was on sale for 10% off the original price. The store
    15·1 answer
  • Please help need answer
    15·2 answers
  • If a bullet travels at 827.0 m/s , what is its speed in miles per hour?
    9·1 answer
  • What are the next three terms in the sequence? -3, 6, 15, 24
    12·1 answer
  • What is the sum of the geometric sequence -4, 24, -144... if there are 10 terms?
    13·1 answer
  • Divide.<br> x2 + 2x - 49<br> X +8<br> The answer is<br> (Simplify your answer.)
    9·2 answers
  • Which is the vertex of the graph of y=3x^2+2x+1
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!