You need to find the hypotenuse of the right triangle.
4² + 9² = c²
16 + 81 = c²
97 = c²
9.85 = c
There are 5,280 ft in a mile.
Multiply 9.85 by 5,280.
9.85 × 5,280 = 52,008
Multiply 52,008 by 110.
52,008 × 110 = <span>5,720,880
The estimated cost for constructing the street would be $</span>5,720,880.
9514 1404 393
Answer:
4 yd/min
Step-by-step explanation:
Change 1 hour to 60 minutes.
(240 yd)/(1 h) = (240 yd)/(60 min) = 4 yd/min
Answer:
The answer to your question is:
Step-by-step explanation:

Factorize 
Factorize 
Simplify 
a) Choose Z since the σ is smallest . The smaller the σ the higher the consistency. Also we can see that the fewest day the student attendance is higher than other while the highest day is the same with others. (L = 130 ,H = 180)
b) Choose W since mean in W is the highest.
-
yards, there are 3 feet per yard