Answer:12
Step-by-step explanation:
12x9=108
108-7=101
Your welcome
It takes Owen 2 minutes to eat 1 carrot stick
Answer:
1. C = $100 = .25(m)
2. C = $150
3. 800 = m
Step-by-step explanation:
1. C = $100 (flat fee rate) + .25m
2. c = $100 + .25(200 miles)
↓
c = $100 + 50
↓
c = 150
3. 300 = 100 + .25(m)
-100 -100 (subtract on both sides)
--------------------------------
200 = .25(m)
------------------- (divide by .25 to get m by itself)
.25
Therefore being 800 = m
Its 43. All triangles add to 180 so 47 + 90 = 137. then subtract 180 - 137 and get 43
Answer:
25 seconds
Step-by-step explanation:
Hi there!
In order to answer this question, first we need to know how many bolts per second are produced by each machine, this can be known by dividing the number of bolts by the time it takes.
For machine A:

For machine B:

So, if the two machines run simultaneously, we will have a rate of prodcution of bolts equal to the sum of both:

Now, we need to know how much time it will take to producee 200 bolts, to find this out we need to divide the amount of bolts by the production rate:

The <em>bolts</em> unit cancell each other and we are left with <em>seconds</em>

So it will take 25 seconds to produce 200 bolts with machine A and B running simultaneously.
Greetings!