Answer:
a) F = 2250 Ib
b) F = 550 Ib
c) new max force ( F newmax ) = 2850 Ib
Explanation:
A) The force the wall of the elevator shaft exert on the motor if the elevator starts from rest and goes up
max capacity of elevator = 24000 Ibs
counterweight = 1000 Ibs
To calculate the force (F) :
we first calculate the Tension using this relationship
Counterweight (1000) - T = ( 1000 / g ) ( g/4 )
Hence T = 750 Ib
next determine F
750 + F - 2400 = 2400 / 4
hence F = 2250 Ib
B ) calculate Tension first
T - 1000 = ( 1000/g ) ( g/4)
T = 1250 Ib
F = 2400 -1250 - 2400/ 4
F = 550 Ib
C ) determine design limit
Max = 2400 * 1.2 = 2880 Ib
750 + new force - 2880 = 2880 / 4
new max force ( F newmax ) = 2850 Ib
Heating A Pot Filled With Water
Answer:
You didn't give the information needed for the answer bud
Explanation:
Answer:
V = IR
Explanation:
Voltage is denoted by V, current is denoted by I and resistance is denoted by R. Voltage is the difference of electric potential between two points. Current is the measure of the rate of flow of electric charge. Resistance is a measure how a device reduces the current flow through itself.
The three properties are related to each other as per the Ohm's law which states that voltage and current are directly proportional to each other, it can be denoted as
Voltage (V) = Current(I) X Resistance(R).