So 30 necklaces with 30cm of string each, and the total cost was $4.41, but we have to find out how much each meter cost. Wow this problem is a little confusing.
To find the total centimeters of string she needs, we do 30 x 30, which is 900. So she needs 900cm of string.
Now, we have to find how much string is per meter. 1 meter is 100cm, and we know that she needs 900cm, so she needs 9 meters of string. Now, we divide 4.41 by 9, giving us 0.49.
So she needs 900cm of string, and it costs $0.49 per meter.