If you assume doubling the workers will halve the time taken to finish then 12 analysts will take 21 days
To finish in 7 days (1/6 of 42 days) you would need 6 x the original number = 36 analysts.
Brook’s Law (see Wikipedia) suggests than adding extra analysts will actually slow the project down!
One reason is the extra people tend to get in each others way.
Answer:
Step-by-step explanation:
Prime factorization requires dividing by primes starting with smallest prime number
402/2=201
201/3=67, 67 is prime so we cannot go further so the prime factorization of 402 is
2X3X67
Answer:
x=4
Step-by-step explanation:
A. integers, c. integers rationals, and d. integers rationals reals. it would not be a natural number, because a natural number is a positive number (and sometimes 0)
Answer:
The required equation is 
Step-by-step explanation:
Consider the provided information.
Let P represent the number of pages left to read after t hours.
Shryia read a 480-page-long book cover to cover in a single session, at a constant rate. After reading for 1.5 hours, she had 402 pages left to read.
Total number of page Shryia read in 1.5 hours is:
480-402 = 78
It is given that the rate is constant i.e 1.5 hours,
Therefore, she read 78 pages in 1.5 hours.
She can read
page per hour
The required equation is:

Where t represents the number of hours.