1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Veseljchak [2.6K]
3 years ago
15

Write an equation for this graph please help me I'm begging u

Mathematics
1 answer:
bekas [8.4K]3 years ago
4 0
First, solve for the slope. This can be found by looking at the y and x intercepts. At x = 0, y = 1.5. At x = 2, y = 0.

Slope is defined as Δy/Δx, or the change in y over the change in x. This means that in order to calculate the slope, you must find the difference between the values of y and divide it by the difference in the values of x for the two points to determine the slope between them.

(0 - 1.5)/(2-0) = (-1.5)/2 = -0.75 or -3/4

Now that you have the slope, we can write the equation in slope intercept form, y = mx + b, where m is the slope we calculated and b is the y intercept, 1.5.

y = (-3/4)x + 1.5
You might be interested in
The Rocky Mountain News (January 24, 1994) indicated that the 20-year mean snowfall in the Denver/Boulder region is 28.76 inches
ycow [4]

Answer:

The p-value of the test is 0.0007 < 0.05, indicating that the the snowfall for the 1993-1994 winters was higher than the previous 20-year average.

Step-by-step explanation:

20-year mean snowfall in the Denver/Boulder region is 28.76 inches. Test if the snowfall for the 1993-1994 winters has higher than the previous 20-year average.

At the null hypothesis, we test if the average was the same, that is, of 28.76 inches. So

H_0: \mu = 28.76

At the alternate hypothesis, we test if the average incresaed, that is, it was higher than 28.76 inches. So

H_1: \mu > 28.76

The test statistic is:

z = \frac{X - \mu}{\frac{\sigma}{\sqrt{n}}}

In which X is the sample mean, \mu is the value tested at the null hypothesis, \sigma is the standard deviation and n is the size of the sample.

28.76 is tested at the null hypothesis:

This means that \mu = 28.76

Standard deviation of 7.5 inches. However, for the winter of 1993-1994, the average snowfall for a sample of 32 different locations was 33 inches.

This means that \sigma = 7.5, X = 33, n = 32.

Value of the test statistic:

z = \frac{X - \mu}{\frac{\sigma}{\sqrt{n}}}

z = \frac{33 - 28.76}{\frac{7.5}{\sqrt{32}}}

z = 3.2

P-value of the test and decision:

The p-value of the test is the probability of finding a sample mean above 33, which is 1 subtracted by the p-value of z = 3.2. In this question, we consider the standard level \alpha = 0.05.

Looking at the z-table, z = 3.2 has a p-value of 0.9993.

1 - 0.9993 = 0.0007

The p-value of the test is 0.0007 < 0.05, indicating that the the snowfall for the 1993-1994 winters was higher than the previous 20-year average.

5 0
2 years ago
Given the sequence in the table below, determine the sigma notation of the sum for term 4 through term 15. N an 1 4 2 −12 3 36 t
Rzqust [24]

By applying basic property of Geometric progression we can say that sum of 15 terms of a sequence whose first three terms are 5, -10 and 2 is                    \sum_{n=4}^{15} 5(-2)^{n-1}$$  

<h3>What is sequence ?</h3>

Sequence is collection of  numbers with some pattern .

Given sequence

a_{1}=5\\\\a_{2}=-10\\\\\\a_{3}=20

We can see that

\frac{a_1}{a_2}=\frac{-10}{5}=-2\\

and

\frac{a_2}{a_3}=\frac{20}{-10}=-2\\

Hence we can say that given sequence is Geometric progression whose first term is 5 and common ratio is -2

Now n^{th}  term of this Geometric progression can be written as

T_{n}= 5\times(-2)^{n-1}

So summation of 15 terms can be written as

\sum_{n=4}^{15} T_{n}\\\\$\\$\sum_{n=4}^{15} 5(-2)^{n-1}$$

By applying basic property of Geometric progression we can say that sum of 15 terms of a sequence whose first three terms are 5, -10 and 2 is                    \sum_{n=4}^{15} 5(-2)^{n-1}$$  

To learn more about Geometric progression visit : brainly.com/question/14320920

8 0
2 years ago
A company has an annual electric bill of $495,000. Of that amount, 3/5 was billed during June, July, August, and September. On a
Simora [160]
A company has an annual electric bill of $495,000. Of that amount, 3/5 was billed during June, July, August, and September. On average, how much money was billed during each of those four months? A. $34,750 B. $74,250 C. $139,000 D. $417,000 so in conclusion just add up all those prices and you should get 7929$
5 0
2 years ago
15 divided by 84<br> i need the answer now
Bingel [31]

Answer:

0.1785

Step-by-step explanation:

6 0
2 years ago
Read 2 more answers
How many terms dose the polynomial have 2x^9 + 3x^6 - x - 20?
riadik2000 [5.3K]

Answer:

3

Step-by-step explanation:

2x^9 = 1

3x^6 = 2

- x - 20 = 3

6 0
3 years ago
Other questions:
  • Please solve this: 0.45-0.05+0.2-0.5
    10·2 answers
  • (3x3 + 11x2 + 4x + 1)/ (x2 + x)
    8·1 answer
  • Divide and answer in simplest form :) 5/3÷3<br><br><br><br><br><br>​
    7·1 answer
  • What is 18/42 in simplest form
    13·2 answers
  • Sandy has 16 roses, 8 daisies, and 32 tulips. She wants to arrange
    9·1 answer
  • I made a fort for my pet porcupine by connecting two boxes. The first box is 10meters long, 7 meters wide, and 5meters high. The
    12·2 answers
  • A=2,b=1,find the value of a+b.​
    8·2 answers
  • Can someone help me with this question I retake this picture
    6·1 answer
  • What is (x+5)(x-1) ? ( expanding brackets )
    10·1 answer
  • Select the correct answer. Rational function h is continuous, with a horizontal asymptote at y = 1. Which function could be func
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!