It would take 20 min to wash so 20 times 6 120 then u add 60 bc there is 6 cars and it takes 10 min to dry each of them off
Answer:
8.6%
Step-by-step explanation:
To find the percent change, you will need to compute the positive difference and then divide the difference by the original (the older amount).
So the positive difference will be obtain by doing larger minus smaller:
6300
- 5800
-----------
500
The older amount was 5800.
So 500/5800 is the answer as a un-reduced fraction.
I'm going to reduce it by dividing top and bottom by 100:
500/5800 = 5/58
5/58 is the answer as a reduced fraction.
5 divided by 58 gives=0.086206897 in the calculator .
Approximately 0.0862 is the answer as a decimal.
To convert this to a percentage, multiply it by a 100:
8.62%
Rounded to the nearest tenths is 8.6%
-------------
So 5800+5800(.0862) should be pretty close to 6300 (not exactly though since we rounded).
5800+5800(.0862)=6299.96 using the calculator.
Answer: im not sure
Step-by-step explanation:
Answer:
P(X > 25) = 0.69
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
The sale prices for a particular car are normally distributed with a mean and standard deviation of 26 thousand dollars and 2 thousand dollars, respectively.
This means that 
Find P(X>25)
This is 1 subtracted by the pvalue of Z when X = 25. So



has a pvalue of 0.31
1 - 0.31 = 0.69.
So
P(X > 25) = 0.69
Answer:
range {1,3,-3,4,1} yes that is it