1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
MAXImum [283]
3 years ago
11

Please help ill give brainliest

Mathematics
2 answers:
mote1985 [20]3 years ago
7 0

Answer:

42 people chose Turkey

Step-by-step explanation:

Create a proportion:

22/28 = 33/x

Cross multiply:

28(33)/22 = x

42= x

SSSSS [86.1K]3 years ago
4 0

Answer:

42

Step-by-step explanation:

You might be interested in
Write the equation of the line that passes through the points (0,8) and (-1,-4).
Anettt [7]

Step-by-step:

Use slope formula to find the slope. (y - y)/(x - x)

Make sure the x and y in front of the minus is a pair that goes together, as well as the x and y behind the minus sign. So

8 - -4 goes on top, that's 12

0 - -1 goes under, thats 1

12/1 is the slope which is just 12. Use either point to fill in the second x and the second y in the point-slope equation. m is the slope.

y - y = m(x - x)

y - 8 = 12(x - 0)

y - 8 = 12x

5 0
2 years ago
Help- i dont understand<br> Just 10 11 and 12 please!
katrin [286]
10. acute angles: 0
Right angles: 4
Obtuse angles: 0
Perpendicular lines: 0
Parallel lines: 2

11. Acute angles: 2
Right angles: 0
Obtuse angles: 1
Perpendicular lines: 0
Parallel lines: 0

12. H
6 0
2 years ago
Solve the systems of equations.<br> y=x + 3<br> y = -x + 1<br><br> x = ???<br> y = ???
riadik2000 [5.3K]

Answer:

x = -1

Step-by-step explanation:

-1 + 3 = 2

-(-1) + 1 = 2 or 1 + 1 = 2

6 0
3 years ago
~PLEASS HELP FAST~
m_a_m_a [10]
The answer is no y varies 8 x varies 2
4 0
3 years ago
Russell and Aaron can build a shed in 8 hours when working together. Aaron works three times as fast as Russel. How long would i
Whitepunk [10]

Answer:

32 hours.

Step-by-step explanation:

Let x represent the time taken by Russell and Aaron to build the shed.

We have been given that Russell and Aaron can build a shed in 8 hours when working together. Aaron works three times as fast as Russel.

Russell's work rate would be \frac{1}{x}.

Since Aaron works three times as fast as Russel, so Aaron's work rate would be \frac{3}{x}.

Part of work done by in one hour would be \frac{1}{8}.

We can represent our given information in an equation as:

\frac{1}{x}+\frac{3}{x}=\frac{1}{8}

Let us solve for x.

\frac{1}{x}*8x+\frac{3}{x}*8x=\frac{1}{8}*8x

8+3*8=x

8+24=x

32=x

Therefore, it will take Russell 32 hours to build the shed working alone.

4 0
3 years ago
Other questions:
  • What is the volume of a cylinder with a base radius 3 and hight 8
    6·2 answers
  • Answer and solution in 2xy-5yz-4x+10z
    6·1 answer
  • X2+9x+20 plz help with it​
    12·2 answers
  • A rectangle or pyramid has a volume of 1296 in.³, a height of 24 inches, and a base length of 6 inches. What is the width of its
    9·1 answer
  • What percent os 3/4 is 1/8
    9·1 answer
  • What is (-4,9) as an inequality
    12·1 answer
  • Find the value if S (s-6)squared= 75
    12·1 answer
  • Help asap I’m very behind 23 points given
    7·2 answers
  • Hi! Pls help:
    13·2 answers
  • Which of the following characteristics best describes the given function of f(x) = 3x - 6?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!