1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
kifflom [539]
3 years ago
14

A bucket that weighs 6 lb and a rope of negligible weight are used to draw water from a well that is 50 ft deep. The bucket is f

illed with 40 lb of water and is pulled up at a rate of 2 ft/s, but water leaks out of a hole in the bucket at a rate of 0.2 lb/s. Find the work done in pulling the bucket to the top of the well.
Mathematics
2 answers:
Natalija [7]3 years ago
5 0

Answer:

Therefore total work done =2050 ft-lb

Step-by-step explanation:

Given that, a bucket are used to drawn water from a well that is 50 ft deep.

(1)

Work done = Force×displacement.

Work done to pull the bucket is

= Weight of the bucket × displacement

=(6×50) ft-lb

=300 ft-lb

(2)

The bucket fill with 40 lb of water and is pulled up at a rate of 2ft/s, but leaks out of a hole in the bucket at a rate of 0.2 lb/s.

Since the well is 50 ft deep.

It takes =\frac{50ft}{2ft/s} =25 s to pull the bucket at the top of the well.

After 25 s it lost (25×0.2)lb =5 lb water.

So the remaining water is = (40-5) lb= 35 lb

Let y is distance above the original depth of 50 ft.

When y=50 ft, weight of the bucket= 40 lb,when y=0 weight of the bucket= 35 lb

The slope of the of water leakage is

=\frac{40-35}{50-0}

=\frac{1}{10}

The bucket holds (40-\frac1{10}y) lb of water when it is y ft above the original depth.

Work done to pull the water in the bucket is

=\int _0^{50}(40-\frac1{10}y)dy

=[40y- \frac1{10}y^2]_0^{50}

=[(40\times 50)-\frac1{10}(50)^2]-[(40\times 0)-\frac1{10}(0)^2]

=1750 ft-lb

Therefore total work done

=Work done to pull the bucket+Work done to pull the water in the bucket

=(300+1750) ft-lb

=2050 ft-lb

max2010maxim [7]3 years ago
4 0

Answer:

Total work done = W_{water}+ W_{bucket}

                            = 1875+300 = 2175ft-lb.

Step-by-step explanation:

According to given scenario, there are two things being pulled to the top of the well.

1. Bucket

2. Water

So, we have to find work done separately for water and bucket.

For total work done, we have to add work done by water and work done by bucket.

Now, For the bucket,

The weight of the bucket is a constant 6 lb, and we"ll  move the bucket a small distance Δy. We have these small distances from y = 0 to y = 50.

W_{bucket} = \int\limits^{50}_0 {6} \, dy

           = (6\times 50 - 6\times0)

           = 300

Thus, the work to lift the bucket out of the well is 300ft-lb.

For the water,

Water leak out of the bucket at a constant rate 0.2 \frac{lb}{s}, so the weight of the water can be modeled with a linear function.

Since well is 50ft deep, it takes

(50ft) \frac{(1s)}{(2ft)} = 25s

to pull the bucket to top of the well after 25s, we lost,

\frac{(0.2lb)}{(1s)} \times 25s = 5lb

so, 35lb water remains in bucket.

Now, when y=0, weight = 35 and when y=50, weight = 40

Slope = \frac{(40-35)}{(50-0)}

          = \frac{1}{10}

So, linear equation is

Weight = \frac{1y}{10} + b

substituting the value,

35 = \frac{1\times0}{10} +b

b=35

Now, the equation of water at any depth y in the well is written as.

       \frac{1\times y}{10} +35

if we move small distance Δy, we have distances from y=0 to y=50

W_{water} = \int\limits^{50}_{0} {\frac{1\times y}{10}+35 } \, dy

                   = (\frac{50^{2} }{2}\times \frac{1}{10}+35\times 50)  -(\frac{1}{10}\times \frac{0^{2} }{2}+35\times 0)

                   = (125+1750) - (0+0)

                   = 1875

Now,

Total work done = W_{water}+ W_{bucket}

                            = 1875+300 = 2175ft-lb.

You might be interested in
What is a reasonable estimate for 8.24 divided by 4? Explain
sashaice [31]
A reasonable estimate for 8.24 divided by 4 would be 2. This would be a reasonable estimate because .24 rlly isn’t all that much so you are able to round down to 8. (Hope that’s right!)
6 0
3 years ago
What is 300 mi converted into km?
skad [1K]

Answer: 482.8032 km.

Step-by-step explanation: ...

5 0
3 years ago
Write as a decimal 3 hundreds and 109 hundredths
8090 [49]
<span>300.0109
I hope this helps
300=3 hundreds

.0109= 109 hundredths</span>
6 0
3 years ago
Will mark branliest!!
zepelin [54]
It’s A Have Ah Good Day
6 0
3 years ago
Read 2 more answers
Hey i need help with a quick math problem if anyone can help please.
astraxan [27]

Answer:

a

Step-by-step explanation:

8 0
2 years ago
Other questions:
  • Can somebody help me with this question
    11·2 answers
  • Please help me please show working answer but show work please
    7·1 answer
  • Use mental math to complete the pattern5×6
    12·1 answer
  • If a store advertised a sale that gave costumers a 1/4 discount, what is the fractions part of the original price that the the c
    9·1 answer
  • The angles in a triangle are such that one angle is 100 degrees more than the smallest angle, while the third angle is 2 times a
    5·1 answer
  • How to solve<br>3|8x|+8=80
    11·1 answer
  • Please help!!!!!!!!!!!!
    15·1 answer
  • Three merchants find a purse lying in the road. The first asserts that the discovery would make him twice as wealthy as the othe
    9·1 answer
  • I need help please. I don’t understand it
    15·2 answers
  • IA man buys buys 62 litres of petrol dailly
    7·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!