Answer:
<u><em>0.006 cents</em></u>
Step-by-step explanation:
divide 1.20 with 200
since a unit price is 1 of something
so 1.20 divided by 200 = 0.006 cents.
0.006 is your answer.
Answer:
d. The average is equal to 12 ounces.
Step-by-step explanation:
In this problem, the drink filling machine must be perfectly calibrated at 12 ounces since it needs to be shut down in cases of overfilling (mean > 12 ounces) and underfilling (mean < 12 ounces). Therefore, the correct approach would be to test if the mean is 12 ounces and the correct set of hypothesis would be:

The correct alternative is d. The average is equal to 12 ounces.
Answer:
w = 0, 4
Step-by-step explanation:
The GCF is 2w
2w (w-4) = 0
w = 0 or 4
Answer:
49 minutes
Step-by-step explanation:
To find the average time the machine was down per day, we need to add up the total time taken and then divide by the number of days. Since there are 5 days, we have:

= 49
So, the average time per day is 49 minutes.
Hope this helped! :)