Answer:
It will cost $39,337.92 for the piller.
Step-by-step explanation:
Given that,
The diameter of the cylinder, d = 8 m
Height of the cylinder, h = 9 m
If concrete cost $87 per cubic meter, we need to find how much the concrete cost for the pillar.
The volume of the cylinder is given by :

Cost per cubic meter = $87
Cost for 452.16 m³ will be :
C = 452.16 × 87
C = $39,337.92
Hence, it will cost $39,337.92 for the piller.
The answer would be -74,137,498.67 when you follow the order of operations. (PEMDAS).
The number of plates is an illustration of permutation and combination
The number of plates is 2592
<h3>How to determine the number of plates</h3>
The range is given as: AVVJ 144 To: BVNP 199 (exclusive)
From the range, we have the following highlights:
- The first letter can be either A or B (i.e. 2 letters)
- The second letter can be only V (i.e. 1 letter)
- The third letter can be from W to M (24 letters)
- There are 54 numbers between 144 and 199
The number of plates (n) is then calculated as:

Evaluate the product

Hence, the number of plates (n) is 2592
Read more about permutation and combination at:
brainly.com/question/12468032
What's the median of -13.78, -3.01, -2.41, -0.28, 0.66, 0.67, 1.05, 1.39, 2.03, 2.2, 2.64, 4.02
victus00 [196]
The median is 0.67 hopefully i didn’t do the math wrong. hope this helps :)