Answer:
The correct answer to the following question is option b.)sends messages involving products of companies previously sued under the CAN-SPAM Act.
Explanation:
This act is an act of Controlling the Assault of Non-Solicited Marketing And Other things.
It is the law that establish the rules for the commercial message and the commercial e-mails, gives recipients right to have the business stops emailing them, and they outline the penalties incurred for those person who has violated the law.
I would have to say the artist.
simply because the artist or publisher does not receive any income on their product.
To understand flow of programming logic flow chat technique been used. Once end user starts any learning programming flow chat design been learned and corrected the mistake. After success of flow chat design end user been advice to do programming and tested in computer.
<u>Explanation:</u>
In flow chart design is used for beginner level programming. Some time to make higher level managers to understand this flow chart design is used.
Flow chart has start, procedure, condition, function or procedure and end with stop diagrams.
Flow chart makes end user understand the flow of logics.
Suppose we need to do a process for a procedure, end user has to design with start flow chart symbol and put a procedure flow chart symbol with identification character, then end user has use same identification character and start designing the procedure in the flow chart diagram.
Procedure in flow char design is used to call same procedure number of time, so that repeated coding is avoided.
Answer:
Aqueous carbon dioxide, CO2 (aq), reacts with water forming carbonic acid, H2CO3 (aq). Carbonic acid may loose protons to form bicarbonate, HCO3- , and carbonate, CO32-. In this case the proton is liberated to the water, decreasing pH. The complex chemical equilibria are described using two acid equilibrium equations.
PLS MARK AS BRAINLIEST
Answer:
a) AL will contains 0011 1100
Explanation:
In assembly language, shifting bits in registers is a common and important practice. One of the shifting operations is the SHR AL, x where the x specifies that the bits be shifted to the right by x places.
SHR AL, 2 therefore means that the bits contained in the AL should be shifted to the right by two (2) places.
For example, if the AL contains binary 1000 1111, the SHR AL, 2 operation will cause the following to happen
Original bit => | 1 | 0 | 0 | 0 | 1 | 1 | 1 | 1 |
Shift once to the right => | 1 | 0 | 0 | 0 | 1 | 1 | 1 | 1 | (0) |
Shift once to the right => | 1 | 0 | 0 | 0 | 1 | 1 | 1 | 1 | (0) | (0) |
Notice;
(i) that there are two shifts - one at a time.
(ii) that the bits in bold face are the bits in the AL after the shift. Those that in regular face are those in the carry flag.
(iii) that the new bits added to the AL after a shift are the ones in bracket. They are always set to 0.