Answer:
Step 1: Estimate the answer by rounding . You'll use this estimate to check your answer later.
Step 2: If the divisor is not a whole number, then move the decimal place n places to the right to make it a whole number. Then move the decimal place in the dividend the same number of places to the right (adding some extra zeros if necessary.)
Step 3: Divide as usual. If the divisor doesn't go in evenly, add zeros to the right of the dividend and keep dividing until you get a 0 remainder, or until a repeating pattern shows up.
Step 4: Put the decimal point in the quotient directly above where the decimal point now is in the dividend.
Step 5: Check your answer against your estimate to see if it's reasonable.
Step-by-step explanation:
Answer:
a. 8
b. 114
Step-by-step explanation:
a.
36/6 = 48/x
36x = 288
x = 8
b.
12/72 = 19/x
1/6 = 19/x
x = 114
Answer:
$44.71 B
Step-by-step explanation:
Take the answers they gave you and multiply them by 1.7%. For B it would look like 44.71 times 1.7%(you can do it in a calculator).When you multiply them it should result in the money charged for overdue balance. (0.76). Feel free to clarify, hope it helps
3 (4x + 6) = 21
4x + 6 = 21/3
4x + 6 = 7
4x = 7 - 6
4x = 1
x = 1/4
Answer:
The answer is below
Step-by-step explanation:
From the image attached, the measurement of the roof is 5 m by 9 m on both sides. Hence:
Area of roof = 2 (5 * 9) = 90 m²
Since solar panels cost $4.00 per square meter, therefore:
Cost of solar panels = $4.00 per square meter * 90 m² = $360
The area of the front wall of the barn = (8 m * 7 m) + (1/2 * 8 m * 3 m) - (4 m * 4 m) = 52 m²
The area of the back wall of the barn = (8 m * 7 m) + (1/2 * 8 m * 3 m) = 68 m²
Area of each side wall of barn = 9 m * 7 m = 63 m²
Total area of wall = 52 m² + 68 m² + (2 * 63 m²) = 246 m²
Cost of shingles = $2.50 for each square meter * 246 m² = $615
Total cost of project = $615 + $360 = $975