Answer:Cost per box: $95.94 ÷ (b)
Cost per tile: [$95.94 ÷ (b)]÷ (t)
First, we are trying to find the cost of each crate. Since the whole order was $95.94, we have to divide. The answer to the cost per box is $15.99.
Second, we are trying to find the cost of each of the tiles in the crates. Since they are in each crate, we divide the crate price from the tiles. The answer of the cost per tile is $.80.
Hope this helped you out!
Answer:
= Sh. 2281.50
Step-by-step explanation:
Area of the path;
(126 × 2.5 ) + (2.5 × (48 - (2.5×2)
= 315 + (2.5 × 43)
= 315 + 107.5
= 422.5 m²
But; the cost of graveling is sh 5.40 per square meter
Therefore; The cost of graveling the whole path;
= 422.5 × 5.40
<u>= Sh. 2281.50</u>
Answer:
a
Step-by-step explanation:
Domain means the change in x.
so the domain will be which values of x the fn goes through.
you can see the black line goes from -9 to 2 in x values.
the -9 isn't filled in, but the 2 is. filled in means it will be with an equals instead of without.
so x is between -9 and 2, 2 is with equals -9 is without,
so the first one.
Tom bought 768 pounds of candy because 333 + 435 = 768