1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
iogann1982 [59]
3 years ago
15

Evaluate f(x) = x 2 + 1 for f(10). 2√2 101 21

Mathematics
1 answer:
WINSTONCH [101]3 years ago
5 0

Answer:

The correct answer is 101.

Step-by-step explanation:

In order to find the answer, simply stick the value in the parenthesis in for x.

f(x) = x^2 + 1

f(10) = 10^2 + 1

f(10) = 100 + 1

f(10) = 101

You might be interested in
It says find the volume of the prism.
Misha Larkins [42]

Answer:

the answer is 3 1/8 cubic cm

Step-by-step explanation:

brainliest if correct hope this helps have a blessed day! :)

7 0
2 years ago
Which of the sails on the boats below has a greater area?
Verdich [7]

Answer:

B

Step-by-step explanation:

6 0
2 years ago
Reallyyy need helpppppppppp
MAXImum [283]

Answer:

r = 3

Step-by-step explanation:

Slope of a line passing through two points (x_1,y_1) and (x_2,y_2) is given by the formula,

Slope 'm' = \frac{y_2-y_1}{x_2-x_1}

Slope of a line passing through (4, 2) and (r, -6) is 8.

8 = \frac{2+6}{4-r}

8(4 - r) = 8

4 - r = 1

r = 4 - 1

r = 3

8 0
2 years ago
Equat<br> Write linear equations given a graph.<br> 3)<br> 6)<br> 2<br> U<br> 10<br> -4 -3 -2 -1
My name is Ann [436]
62 ka73 suzizns si8827
6 0
2 years ago
Suppose that the amount of time it takes to build a highway varies directly with the length of the highway and inversely with th
KatRina [158]

Answer:

21 weeks

Step-by-step explanation:

In this question, we are to use proportionality to find the solution to the question.

We were made to know that the time taken to build the highway is varied directly with the length and inversely with the number of workers.

Let us make a mathematical representation for this.

Let the time be t, number of workers be w and length be l

t is directly proportional to l and inversely proportional to w

Mathematically;

t = kl/w

Where k is the constant of proportionality.

Let’s find the value of k

150 workers built 12 miles of highway in 14 weeks ; plug these in the equation to get k

14 = k * 12/150

k = 150 * 14/12 = 175

Now we want to get t given w and l

from ;

t = kl/w

We can get t; where l = 15 and w = 125

t = 175 * 15/125

t = 21 weeks

4 0
3 years ago
Read 2 more answers
Other questions:
  • Student finished 8 homework problems. If the ratio of the problems she finished to the problems she had left was 4:1 How many ho
    12·1 answer
  • The Markdown of $18.99 to 25%
    7·2 answers
  • brad grew 4 1/4 inches this year and is now 56 7/8 IN tall write and solve an equation to find Brads height at the start of this
    12·2 answers
  • I got 7. check my answer please :)
    9·2 answers
  • Helpppppppp meeeee!!!!!​
    7·1 answer
  • The National Wildlife Refuge supports __________ wildlife refuges.
    12·2 answers
  • Which description describes the potential graph of a system of linear equations with no solution?
    15·2 answers
  • Pls anwer,i really need help. ​
    13·1 answer
  • Can’t figure this problem out need help
    10·1 answer
  • Find the value of the expression (x2−4)3x when x = 5.
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!