Work problems are solved by first figuring out how much of the job they can do in each hour. Shawn can do 1/4 of the job in an hour and Ellie can do 1/6 of the job in an hour. 1/6+1/4=2/12+3/12=5/12. This means that they can do 5/12 of the job an hour. This means that together they can do the job in 2 2/5 hours. The foreman is obviously wrong because first of all Shawn can do it alone in 4 hours, so with Ellie he will do it faster, and second of all 2 2/5<5. Hope this helped!
Answer:
Step-by-step explanation:
3(7-22x) = 21-66x
Answer:
No. It is not.
Step-by-step explanation:
Dividing 5x³+21x²-40x-15 by 5x+4 gives x²+5x-4 with a remainder. Which means, 5x+4 is not a factor of 5x³+21x²-40x-15
Answer:
P = -2600/3 t + 25600/3
P = -8200/3
Step-by-step explanation:
t is the time in years since 1990, so two points on the line are (5, 4200) and (8, 1600).
Using the points to find the slope:
m = (y₂ − y₁) / (x₂ − x₁)
m = (1600 − 4200) / (8 − 5)
m = -2600/3
Now writing the equation in point-slope form:
P − 4200 = -2600/3 (t − 5)
Converting to slope-intercept form:
P − 4200 = -2600/3 t + 13000/3
P = -2600/3 t + 25600/3
In 2003, t = 13:
P = -2600/3 (13) + 25600/3
P = -8200/3