1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Natasha_Volkova [10]
3 years ago
15

Which part of the navigation window will Jonah find the insert tab

Computers and Technology
2 answers:
Jlenok [28]3 years ago
5 0

Answer: ribbon area

Explanation:

olganol [36]3 years ago
3 0

In the top bar on the left side. I can give a better answer if you give a picture of the window it's talking about.

You might be interested in
Can i get some help please .
Alex787 [66]

Answer:

Interest

So, lets say that you took a loan from the bank of 20,000. But, when you are supposed to pay it back, you need to pay 25,000. This is because of interest. When the bank gives you the money, they cannot give it to you just like that. There is no profit coming from it. So, there is the thing called interest which basically says that since you took money from the bank, you need to pay a little more because you borrowed money from them.

4 0
3 years ago
Read 2 more answers
With respect to PERT and​ CPM, slack A. is a task or subproject that must be completed. B. marks the start or completion of a ta
Wewaii [24]

Answer:

The correct answer is C) With respect to PERT and​ CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.

Explanation:

The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.

Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.

There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.

The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.

That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.

8 0
3 years ago
Binary divide 1101011 by 111​
denis-greek [22]

is this computer subject

5 0
3 years ago
Read 2 more answers
What is the MINIMUM number of paths that would need to be broken to prevent Computing Device A from connecting with Computing De
Sveta_85 [38]

Answer:

The answer is "Option c".

Explanation:

In the given question the device A is connected by 3 wires, contributing all of them, which also includes several connector paths. When all the wires of A are broken down, and if all of this leaves no routes that can be used. Even so, if it is done to E, it's also linked to four different routes. Its solution would've been C because its value will be the MINIMUM.

4 0
3 years ago
Read 2 more answers
research about the various models of intel processors from the last decade focusing on their speed and cost​
Likurg_2 [28]

The Intel announced the eighth- generation chips will offer up to 40 percent speed boost  over the previous generation.

Explanation:

The most popular Intel processors are the core i3, i5, and i7 product lines. The core i3 is entry level and core i7 processors are the powerful hyper-threaded quad-core options.

The CPU does good job in understanding and completing single tasks. A clock speed of 3.5 GHz to 4.0 GHz is considered a good clock speeding for gaming. It is useful for having good single thread performance.

Intel's prior series of 8086,80186, 80386 and 80486 microprocessors, the first P5 based microprocessor released as original Intel Pentium.

8 0
3 years ago
Other questions:
  • Pointsfor a failover cluster, what type of network would you use to communicate with an iscsi device?
    15·1 answer
  • 9. Name at least two types of hard drives?
    6·1 answer
  • A small company has hired you to take over its IT needs. The company currently has seven on-site employees and 12 remote employe
    12·1 answer
  • HELP ASAP
    10·2 answers
  • A network address is 131.247.160.0/19. The 19 implies that
    5·1 answer
  • "The principle of ______________ states that programs tend to access data and instructions nearby recently used data and instruc
    12·1 answer
  • Reference variables allow arguments to be passed by ____________.
    7·1 answer
  • PLEASE ANSWER THIS ASAP‼️
    10·2 answers
  • On a Windows system, which Task Manager tab would you use to adjust the priority given to a specific program
    13·1 answer
  • Which insert image option allows a user to compile, modify, and add captions to images?
    5·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!