It seemed like it should have been so simple. There was nothing inherently difficult with getting the project done. It was simple and straightforward enough that even a child should have been able to complete it on time, but that wasn't the case. The deadline had arrived and the project remained unfinished.
A: adding together 2 and 3 a bunch of times
2+3+2+3+2+3 etc does not equal 28. a possible answer can be 27 students.
Answer:
4
Step-by-step explanation:
Answer:
Z scores between -0.995 and 0.995 bound the middle 68% of the area under the stanrard normal curve
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Middle 68%
Between the 50 - (68/2) = 16th percentile and the 50 + (68/2) = 84th percentile.
16th percentile:
X when Z has a pvalue of 0.16. So X when Z = -0.995
84th percentile:
X when Z has a pvalue of 0.84. So X when Z = 0.995.
Z scores between -0.995 and 0.995 bound the middle 68% of the area under the stanrard normal curve
I am not shere but I thing is 120
Step-by-step explanation:
like 120