1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Elden [556K]
3 years ago
8

Math mathnmath is hard and there is no point of public education

Mathematics
1 answer:
evablogger [386]3 years ago
5 0
I thought that to till on saturday my friend was doing school i was with him he had to do some math algebra 2b he needs it to be a mechanical engineer

You might be interested in
Where are the x-intercept(s) of the graph?
lapo4ka [179]

Answer:

The answer would be B.

Step-by-step explanation:

The X-intercept is simply the point in which the line crosses the x axis, and the point where it crosses or touches is 0, 0

6 0
3 years ago
X + y = 12
liberstina [14]
We are given with two equations to find the values of two variables, hence the problem can be solved.

Adding the two equations:

x + y = 12<u>x - y = 10
</u>2x    = 22
<u />x =11
y = 1
8 0
3 years ago
Read 2 more answers
Two airplanes are flying to the same airport. Their positions are shown in the graph. Write a system of linear equations that re
wariber [46]

Answer:

Airplane #1 equation: y=5/13x+42/13

Airplane #2 equation: y=1/3x+14

Step-by-step explanation:

So to find the slope of each airplane, you use the formula y2-y1/x2-x1. That means, for airplane#1 the equation will be 9-4/15-2. Simplify this and get 5/13. Then, for airplane#2, the equation will be 12-9/6-15. Simplify this and get 3/-9 and divide each side by 3 to get 1/-3 or -1/3. Next, use point slope formula to find the system of linear equations. Point slope formula is y-y1=m(x-x1). M is the slope. Use any point from the line. In this case, I will use (2,4). Tat means the first airplane's equation would be y-4=5/13(x-2). Then y-4=5/13x-10/13. Then, convert four into a fraction with a denominator of 13. This means, you have to multiply 4 by 13 to get 52/13. Add 52/13 to -10/13 to get 42/13. That means the first equation will be y=5/13x+42/13. The second equation point will be (6,12). This means the equation will be y-12=-1/3(x-6). Simplify this to get y-12=-1/3x+2. Simplify this to get y=1/3x+14. Therefore, Airplane#1 equation will be y=5/13x+42/13 and airplane #2 equation will be  y=1/3x+14.

Hope this helps

6 0
3 years ago
When the input of the function is -4 what is the output of the function
IceJOKER [234]

Answer:

The output is 5

Step-by-step explanation:

-4 is the input (x value). To find the output, you have to find where -4 is on the line. -4 is on the line when 5 is the y coordinate (output).

8 0
3 years ago
A report indicated that 37% of adults had received a bogus email intended to steal personal information. Suppose a random sample
fiasKO [112]

Answer:

5.05% probability that no more than 34% had received such an email.

Step-by-step explanation:

We use the binomial approximation to the normal to solve this problem.

Binomial probability distribution

Probability of exactly x sucesses on n repeated trials, with p probability.

Can be approximated to a normal distribution, using the expected value and the standard deviation.

The expected value of the binomial distribution is:

E(X) = np

The standard deviation of the binomial distribution is:

\sqrt{V(X)} = \sqrt{np(1-p)}

Normal probability distribution

Problems of normally distributed samples can be solved using the z-score formula.

In a set with mean \mu and standard deviation \sigma, the zscore of a measure X is given by:

Z = \frac{X - \mu}{\sigma}

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.

When we are approximating a binomial distribution to a normal one, we have that \mu = E(X), \sigma = \sqrt{V(X)}.

In this problem, we have that:

n = 700, p = 0.37

\mu = E(X) = np = 700*0.37 = 259

\sigma = \sqrt{V(X)} = \sqrt{np(1-p)} = \sqrt{700*0.37*0.63} = 12.77

In a random sample of 700 adults, what is the probability that no more than 34% had received such an email?

34% is 0.34*700 = 238

So this probability is the pvalue of Z when X = 238.

Z = \frac{X - \mu}{\sigma}

Z = \frac{238 - 259}{12.77}

Z = -1.64

Z = -1.64 has a pvalue of 0.0505

5.05% probability that no more than 34% had received such an email.

7 0
3 years ago
Other questions:
  • Divide. (–6m 7 + 20m 6) ÷ 2m 4 A. –3m 3 + 20m 6 B. –3m 3 + 10m 2 C. –6m 7 + 20m 2 D. –3m 7 + 10m 6 Reset Selection
    12·2 answers
  • Jill says that 6 is a common factor of 56 and 36 is she correct explain
    13·2 answers
  • -3x+24y-36 factor the expression
    15·1 answer
  • 50/22 rounded to the hundredth
    14·1 answer
  • What is the sum of fifteen and ten?
    14·1 answer
  • a total eclipse in 2003 lasted 2 17/24,minutes in 2005 it lasted 3/8 of a minute how much longer did it last in 2003
    12·2 answers
  • Is there a difference between 2x+3 and 3+2x?
    5·1 answer
  • In mrs. smiths class every time you turn in assignments you earn 1 homework pass. write 3 equivalent ratios of turned in assignm
    7·2 answers
  • Is this congruent by SSS, SAS, AAS, ASA??
    7·1 answer
  • A garden has an area of 286ft. It’s length is 9ft more than it’s width. What are the dimensions of the garden?
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!