The answer is D, Multiplication
Answer:
each gift =$10
total=y
number of gifts =x
therefore,total= each gift * number of gifts
=$10* x
Answer: 17
21-4=17
4+17=21
21+17=38 and so on..
Answer: 120 days
Step-by-step explanation:
A can complete it in 16 days.
=100/16 =6.25%/day.
B has ten days to do it.
10% every day is equal to 100/10.
So they would each contribute 16.25 percent per day as a group.
then for six days,
16.25*6 =97.50percent
97.50% of the work has been finished, in other words.
The amount of work left is now 100-97.5 = 2.5.
C finishes up the remaining job in 3 days
3.5% in 3 days, to be exact.
Consequently, he will finish his entire project in 120 days.
[2.5 * 40 = 100 percent; 40 * 3 = 120 days]
Answer:
We can use slope intercept form to get the points needed. Y= -7+1/3x The points are (0,-7) and (3,-6)
Step-by-step explanation:
Subtract 2x from the left side and place it over to the right side with the 42. Now we have -6y= 42-2x. From here we divide by -6 and we get y= -7+1/3x. We know that are slope is 1/3 which the one is the rise and the 3 is the run. We also know that our y intercept is -7. We plot the points at (0,-7) and (3,-6)