1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
nikklg [1K]
3 years ago
12

Need help finding the x, y, and z. please and thank you

Mathematics
1 answer:
Reptile [31]3 years ago
4 0

The first step in any problem is to look at what you are given. When solving systems of linear equations, it is often helpful to eliminate one or more of the variables by adding or subtracting a multiple of one equation with a multiple of another. It is convenient when at least one of the multipliers is 1.

Here, we can cancel the y-terms in the 2nd and 3rd equations simply by adding them together. This gives

... (5x +y -4z) +(-3x -y +5z) = (41) +(-45)

... 2x +z = -4 . . . . simplified

Likewise, we can add 3 times the second equation to the first to cancel y in that sum.

... 3(5x +y -4z) +(2x -3y +z) = 3(41) + (-1)

...15x +3y -12z +2x -3y +z = 123 -1

...17x -11z = 122 . . . . simplified

Now that we have 2 equations in x and z, we can go through the same process. We observe that the coefficient of z is +1 in the first equation and -11 in the second. The means we can cancel the z terms by adding 11 times the first equation to the second:

... 11(2x +z) +(17x -11z) = 11(-4) +122

...22x +17x = 78 . . . . . . simplify a little bit

... x = 78/39 = 2 . . . . . . divide by 39

From above, we find

... z = -4 -2x = -4 -2·2 = -8

... y = 41 -5x +4z = 41-5(2) +4(-8) = 41 -42 = -1

The solution is (x, y, z) = (2, -1, -8).

_____

The method of elimination used here will vary with the system of equations. If you want to employ a consistent method, you can use Cramer's Rule, Gaussian elimination, or matrix methods. Since you apparently don't mind help from technology, learning to do this on your graphing calculator can also be a good idea.

You might be interested in
Kirsten and Molly are on a 3-day bike ride. The entire route is 156 miles. On the first day they biked 64 miles, and on the seco
timama [110]
The distance that Kirsten and Molly need to bike on their third day is obtained by subtracting the sum of the distances they have traveled after two days from the length of the entire route.
 
                      distance left = 156 miles - (64 miles + 45 miles)
                                            = 47 miles
Thus, Kirsten and Molly need to bike 47 miles on their third day. 
3 0
3 years ago
Hey can you please help! posted picture of question
frosja888 [35]
The solution of the system can be x - 3y = 4 only if both the equations can be simplified to x - 3y = 4.

This will mean that both the equations will result in the same line which is x - 3y = 4 and thus have infinitely many solutions.

Second equation is:

Qx - 6y = 8 
Taking 2 common we get:

(Q/2)x - 3y = 4

Comparing this equation to x- 3y = 4, we can say that 

Q/2 = 1
So,
Q = 2

Therefore, the second equation will be:

2x - 6y = 8
5 0
3 years ago
What is the domain and range? <br><br> {(-7,5), (-6,1), (-5,0), (-4,1)}
Monica [59]
The Domain is the first number of the pair
D= -7, -6, -5, -4
The Range is the second number of the pair
R= 5, 1, 0, when a number repeats like the number one you can put it once.


8 0
3 years ago
In a study of parents' perceptions of their children's size, researchers asked parents to estimate their youngest child's height
tatyana61 [14]

Answer:

Test statistic t=6.505

P-value=0

Step-by-step explanation:

This is a hypothesis test for the population mean.

The claim is that parents tend to underestimate their youngest child's size.

Then, the null and alternative hypothesis are:

H_0: \mu=0\\\\H_a:\mu> 0

The significance level is assumed to be 0.05.

The sample has a size n=39.

The sample mean is M=7.5.

As the standard deviation of the population is not known, we estimate it with the sample standard deviation, that has a value of s=7.2.

The estimated standard error of the mean is computed using the formula:

s_M=\dfrac{s}{\sqrt{n}}=\dfrac{7.2}{\sqrt{39}}=1.153

Then, we can calculate the t-statistic as:

t=\dfrac{M-\mu}{s/\sqrt{n}}=\dfrac{7.5-0}{1.153}=\dfrac{7.5}{1.153}=6.505

The degrees of freedom for this sample size are:

df=n-1=39-1=38

This test is a right-tailed test, with 38 degrees of freedom and t=6.505, so the P-value for this test is calculated as (using a t-table):

P-value=P(t>6.505)=0

As the P-value (0) is smaller than the significance level (0.05), the effect is  significant.

The null hypothesis is rejected.

There is  enough evidence to support the claim that parents tend to underestimate their youngest child's size.

5 0
3 years ago
Which statement explains the type of function that is represented by the equation
eduard

Answer:

C

Step-by-step explanation:

The function has a variable that will make the graph curve up.

3 0
2 years ago
Other questions:
  • Mitchell is a big coffee fan, so he always takes care of coffee brewing at the office. Normally he uses 100 grams of Robusta cof
    12·1 answer
  • A container shaped as a rectangular prism can hold 756 wooden cube blocks with edge lengths of 13 ft. What is the volume of the
    10·2 answers
  • 6. Jose deposited $950.00 into his bank account. After two months, if he dosen't deposit
    6·1 answer
  • What is the surface area of the figure?
    9·2 answers
  • Can someone do all of those PLEASE , and show your work ! Will definitely mark as brainlest !!
    7·1 answer
  • The figure shows the location of three points around a lake. The length of the lake, BC, is also shown.
    9·2 answers
  • A person purchased a used Chevrolet
    14·2 answers
  • Find the coordinates of the intersection of the diagonals of the parallelogram with the vertices Q(-1,3), R(5,2), S(1, - 2), and
    15·1 answer
  • Mike Mowed 5 Lawns last week and 7 lawns this week and earned $180. He earned the same amount mowing each lawn. How much did Mik
    11·1 answer
  • Select the correct answer. A company manufactures computers. Function N represents the number of components that a new employee
    14·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!