Answer:
I came up with -12
Step-by-step explanation:
8 workers = 6 days to complete
x workers = 4 days faster to complete
6/4=1.5 days faster
1.5 x 8 = 12 workers needed to complete the wall in fours days
Answer:
b
Step-by-step explanation:
5+9=14 in numerical expression
Answer: 10 bags that weigh 2 lb.
5 bags that weigh 4 lb.
2.5 bags that weigh 8 lb.
Hope this helps.
Step-by-step explanation:
In order to find which is the answer, we will go step-by-step. Numbers that are not followed by I are drawn on the Real Axis and the other ones are drawn on the Imaginary Axis. You go first on the Real Axis and then on the Imaginary Axis and intersect those 2 points. If a number does not have an imaginary or real part you can assume that is equal to 0. As you can notice the number that is not in the shaded area is <span>2 − I</span>