129 is 249 degrees warmer than -120 because -120+120=0 and then you add 129 to 0 which is 129. that means you add 120 and 129 to get 249
Answer:
Half of each day is taken up by sleeping and eating.
Step-by-step explanation:
Answer:
These correspond to two types of cost: fixed cost and variable cost. Fixed cost (FC): the cost of all fixed inputs in a production process. Another way of saying this: production costs that do not change with the quantity of output produced. Variable cost (VC): the cost of all variable inputs in a production process.
10. 150
11. 1250
12. 105
13. 158000
15. B