Answer:
Project A : $58,000
Project B: $52800
Project A should be selected as it has a higher expected profit value than project B
Step-by-step explanation:
Given the following:
PROJECT A:
Profit : ---------50000--90,000--10,000
Probability: ----0.6-------0.3--------0.1
PROJECT B:
Loss of 20,000 = -20,000 in profit terms
Profit : -----100,000--64,000--(-20,000)
Probability: ----0.1-------0.7--------0.2
Expected profit:
Profit value * probability of profit
Expected profit on project A:
[(50000*0.6)+(90000*0.3)+(10000*0.1)
30000 + 27000 + 1000 = $58000
Expected profit on project B:
[(100000*0.1)+(64000*0.7)+(-20000*0.2)
10000 + 44800 - 4000 = $50800
Project A should be selected as it has a higher expected profit value than project B
The surface area of a rectangular prism is:
A=2(xy+xz+yz) where x,y, and z are the dimensions, in this case:
A=2(312*114+312*2+114*2)
A=2(35568+624+228)
A=2(36420)
A=72840 ft^2
The rate of change of the cost of the taxi ride is $2.00 per minute.
12/15 study a language 5/15 of them study german- correct me if i’m wrong is it 5:12?
Answer:
46
Step-by-step explanation:
let that number x
so
I do cross multiplication so 23*100=2300 and 50*x=50x
so 50x=2300 divide both by 50
x=46