Answer:
When reviewing your project requirements, it is important to bring your entire team together and review the project part by part along with all the individuals who will participate in it.
Explanation:
Requirements review is a very important step in starting a project. This is because it allows the project to be placed in a document and can be analyzed in a decomposed way. That is, the project leader will be able to analyze each part of the project and make specific notes, modifications and anything else that can reduce flaws and increase the project's capacity to obtain positive results. However, it is important that after this analysis, the leader brings all the project members together and shows them everything that was decided by reviewing the requirements.
Embarrassment, envy, anger.
The 32Kg dog will consume less than 2.5Kg of water perday.
<h3>What is hyperadrenocorticism ?</h3>
The disease, makes the dog consume a lot of water. It is a diseases that affects the middle-aged and geriatric dogs. It can be caused by adminsitration of glucocorticoids for a long time.
When a dog begins to respond to the treatment for hyperadrenocorticism , the 32Kg dog will consume less than 2.5Kg of water perday.
Learn more about hyperadrenocorticism: brainly.com/question/1388366?
I’m pretty sure that your answer would be A