31 out of 50 is
62%Divide 31 over 50:
Multiply 0.62 and 100. This will convert the decimal to a percentage:
I believe the answer is 15 because if you divide 270/18 you get 15 <span />
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
Since it's isosceles, ∠ABC = (180-30) / 2 = 75
If you have a picture that shows line c on a graph, you could find your y-intercept or b. If not, you need the y-intercept to make an equation.