Answer:
total cost= $5,814
Step-by-step explanation:
Total linear feet measured: (110 x 2) + (270 x 2) = 760 linear ft
total sq ft= 760 x (7) = 5320 sq ft
total linear ft x labor= 760 x 1.70 = 1292 labor
Total sq ft x Cyclone fencing cost= 5320 x .85 = 4522
the total cost is 1292 + 4522 = $5,814
-- The trains start moving at the same time.
-- The space between them is initially 252.5 miles.
-- They reduce the distance between them at the rate of (124.7+253.5)=378.2mph.
-- It will take them (252.5 / 378.2) = 0.6676 hour to meet.
That's 40min 3.49sec .
-- After tooting and puffing toward each other for 8 minutes, they still have <em>32min 3.49sec</em> to go before they meet each other. We're all hoping that they're on different tracks.
7-3y=22
-7 -7
-3y=15
Divide by -3. y=-5
I believe the answer is (z - 1)(z - 12).
Hope this helps!