1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
BabaBlast [244]
3 years ago
7

The cost of a $12.95 pizza was shared evenly by 5 friends.How much did each person pay

Mathematics
1 answer:
melomori [17]3 years ago
6 0

Divide 5 by 12.95.

Each friend paid $2.59 each.

You might be interested in
A number is multiplied by 4 and then 12 is added. the result is 36. what is the number?
musickatia [10]

Answer:

6

Step-by-step explanation:

4 * x + 12= 36

          -12  -12

4x = 24

x= 6

6 0
2 years ago
Read 2 more answers
Salma made 6 identical necklaces, each having beads and a pendant. The total cost of the beads and pendants for all 6 necklaces
IRINA_888 [86]

Answer:

$3.30

Step-by-step explanation:

2.60*6= $15.60 beads per necklace

35.40-15.60= $19.80 total pendant

19.80/6= $3.30 per pendant

8 0
2 years ago
Read 2 more answers
Can someone help me please
Tasya [4]

Answer:

  Square

Step-by-step explanation:

The length of AB is (a+b)-a = b. The length of BC is b-0 = b. So, adjacent sides are the same length. AB has a constant y-value, so is horizontal. BC has a constant x-value, so is vertical.

A figure with horizontal and vertical sides of the same length is a square.

7 0
3 years ago
Pls help answer that shows work will get brainliest
hichkok12 [17]
The anwser to the problem is C.

7 0
3 years ago
Machine A produces bolts at a uniform rate of 120 every 40 seconds, and Machine B produces bolts at a uniform rate of 100 every
Nutka1998 [239]

Answer:

25 seconds

Step-by-step explanation:

Hi there!

In order to answer this question, first we need to know how many bolts per second are produced by each machine, this can be known by dividing the number of bolts by the time it takes.

For machine A:

A = \frac{120 bolts}{40 s}= 3 \frac{bolts}{s}

For machine B:

B = \frac{100 bolts}{20 s}= 5 \frac{bolts}{s}

So, if the two machines run simultaneously, we will have a rate of prodcution of bolts equal to the sum of both:

A+B=(3+5)\frac{bolts}{s}=8\frac{bolts}{s}

Now, we need to know how much time it will take to producee 200 bolts, to find this out we need to divide the amount of bolts by the production rate:

t = \frac{bolts}{ProductionRate}= \frac{200 bolts}{8 \frac{bolts}{s} }

The <em>bolts</em> unit cancell each other and we are left with <em>seconds</em>

t = \frac{200}{8} s = 25 s

So it will take 25 seconds to produce 200 bolts with machine A and B running simultaneously.

Greetings!

4 0
3 years ago
Read 2 more answers
Other questions:
  • CAN SOMEONE HELP ME FIND THE AREA OF THIS TRIANGLE
    10·2 answers
  • Simplify (4x^– 4)^– 3
    8·1 answer
  • What is the remainder of, 96 divided by 7?
    14·1 answer
  • What does 6×3+(9-3)+1 equal?
    14·2 answers
  • Solve for x. Enter the solutions from least to greatest.
    13·1 answer
  • Tanya purchases gifts for two friends The first is a purse for $19.99, and the second is pair of shoot. Her total is $45.67 befo
    9·1 answer
  • Greg ran 12 miles a day on 18 different days last month. How many miles did he run?
    6·2 answers
  • Solve the system of two linear equations below graphically y= -x + 1 y= -1/3+ 3
    15·1 answer
  • HELP ASAP Which expression is equivalent to 1/8x−1/2?
    6·2 answers
  • How can we describe the relationships that exist between circles and lines?
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!