Answer:
5
Explanation:
5?? okay I'm not sure here but if shes getting all 3 for 2 dollars a piece then she only spent $6 dollars. 5+4+2 is 11. 11-6 is 5
Small business is difficult in the economy because its self made
In forward and futures contracts, the risk of non-fulfillment of contract terms is most likely borne by <u>both parties</u><u> to the contract</u>.
<h3>What are forward and futures contracts?</h3>
The difference between a forward and futures contract lies in their establishment.
A forward contract is a personal arrangement traded over the counter whereas, a futures contract is a standardized contract made through an established exchange.
Thus, in forward and futures contracts, the risk of non-fulfillment of contract terms is most likely borne by <u>both parties</u><u> to the contract</u>.
Learn more about forward and futures contacts at brainly.com/question/15581105
#SPJ12
Answer:
The conception of man as an economic animal is implied by the view that economic production is the determining “factor” or “sphere” of man or society. Against this conception can be put another, that of man as praxis. This takes account of man as a creative being, capable of realizing his freedom through his own activity. In this article the theory of the determining role of the “economic factor”, and the theory of factors in general have been examined. The economic interpretation of history, a variant of the theory of factors, has been acknowledged as partly true for the self‐alienated man and society, but the theory of factors in any variant has been found inadequate as a general theory of man, or society. The possibility of freedom cannot be reduced to the fact that the determining roles played by “factors”, vary, or to the hope that the economic “factor” can be subordinated to a “better” one. Man's freedom consists in his resolving the conflict of “factors”, and in realizing himself as an integral creative being, no longer split into independent and mutually opposed spheres.
Explanation:
that should help
Answer:
2040.
Explanation:
To reach the total manufacturing cost we need to calculate machining and assembling overhead rate first, in order to calculate the rate we need to divide manufacturing overhead cost on number of hours
Machining OH rate = 280000 / 50000 = 5.60
Assembling OH rate = 360000/40000 = 9.00
manufacturing cost:
machine Assembly Total
Material 425 175 600
labor 275 300 575
Overhead 865
(50*5.60) 280
(65*9) 585
Total cost 2040