Answer: A company saves $134.38 by choosing to make 50 of Box 2 instead of Box 1
Step-by-step explanation:
Hi, to answer this question we have to calculate the surface area of both boxes.
<em>Surface area (A) = 2wl + 2lh + 2hw,
</em>
Where w is width, l is length , and h is height.
- Box 1 = A = 2(6x20) + 2( 20x4) + 2 (4 x 6) =2 (120)+ 2 (80)+ 2(24) =448 in2
- Box 2 = A = 2 (4x15)+ 2(15x8)+ 2(8x4) = 2(60)+2(120)+2(32)=424 in2
Since 1 inch = 0.0833333 foot
- Box 1 = 448 in2 x 0,0833333 =37.34 ft2
- Box 2= 424 in2 x 0,0833333 =35.19 ft2
Since the material used to make a storage box costs $1.25 per square foot.
- Box 1 =37.34 ft2 x1.25 = $ 46.675
- Box 2= 35.19 ft2 x 1.25 =$43.98
Since 50 of each are made:
- Box 1 = $ 46.675 x50 =2,333.750
- Box 2= $43.98 x50 =2,199.37
Subtracting both costs:
2,333.750(1) - 2,199.37(2) = $134.38
Answer:
119.2
Step-by-step explanation:
Given the following :
Mean (m) = 100 years
Standard deviation (sd) = 15 years
closest to the age of a Galápagos Islands giant tortoise at the 90th percentile of the
distribution?
Obtain the Zscore for 90th percentile (0.90) on the z table = 1.28
Zscore = (X - mean) / standard deviation
1.28 = (X - 100) / 15
1.28 × 15 = X - 100
19.2 = X - 100
19.2 + 100 = X
X = 119.2
X = -12 !!
so first rewrite the fraction
multiply both sides
move the constant to the right
change the signs
then you have your solution
Answer:
$491.56
Step-by-step explanation:
Total number of hours worked by Frieda = 26 hours 13 minutes
lets convert 13 minutes to hour
60 minutes = 1 hour\
1 minutes = 1/60 hours
13 minutes = 13/60 hours
Thus,
Total number of hours worked by Frieda = (26 + 13/60) hours
In 1 hours Freida earns = $18.75
in (26 + 13/60) hours Frieda earns = $18.75((26 + 13/60)) = 487.5 + 4.06
in (26 + 13/60) hours Frieda earns = $491.56 (Answer)