You didn't write what to do with the fraction but I think you meant to ask to simplify it:
38b/-19
Multiply - 19 from top and bottom :
-2b
Answer:
Step-by-step explanation:
You need to be specific. Did the weight decrease by 60 tons or 60 pounds? I assume tons, but in math, you can't assume.
This problem seems overly simple, so I am wondering if some information is missing. With the given information and assuming the decrease was in fact 60 tons, you would have:
125,890 - 60 = 125,830 tons
Answer: The minimum reliability for the second stage be 0.979.
Step-by-step explanation:
Since we have given that
Probability for the overall rocket reliable for a successful mission = 97%
Probability for the first stage = 99%
We need to find the minimum reliability for the second stage :
So, it becomes:
P(overall reliability) = P(first stage ) × P(second stage)

Hence, the minimum reliability for the second stage be 0.979.
Answer:
false
Step-by-step explanation:
hope it helps
yan lang po alam ko
Two small rectangle at the end areas are:
3x5=15
15x2=30
Longer middle rectangle is:
Length:5+3+5+3=16
Width:9
16x9=144
30+144=174