I believe the answer is False.
Sorry if wrong
'Capturing a photon by<em> isomerization and rhodopsin </em>of retinal' is the first step necessary for initiating the visual transduction cascade in rods.
Visual transduction refers to the process in the eye where absorption of light in the 'retina' is translated into electrical signals that then reach the brain. It is correct to state that visual transduction is the photochemical reaction that takes place when light or photon is converted to an electric signal in the retina. The visual pigment in the rods, called rhodopsin, is a membrane protein placed in the outer segments of the rods.
When initiating the visual transduction cascade in rods the first vital step is to capture a photon by<em> isomerization and rhodopsin</em> of retinal'.
You can leran more about visual transduction at
brainly.com/question/13798113
#SPJ4
Answer:
Continuous insulation helps in eliminating the necessity of applying extra materials to achieve moisture barrier demands, reducing labor and material cost.
Continuous insulation helps building last much longer over a period of time,without the need to upgrade and repair.
Inside the placement of continuous insulation in the envelope needed includes the following; the foundation wall or slab insulation, balcony interface, bond joist insulation, insulation against sub floor, on the interior of masonry wall.
Explanation:
Solution:
The analytical path to success contains a well planned and designed building exterior, which avoids the loss of energy, control cost and the maximization of technology advancement in materials.
Property installed continuous insulation on the exterior can also execute as an air barrier. the flashing of wall penetrations can form into a drainage plane. this plane can stop potentially damaging moisture from entering into the wall assembly.
By making use of continuous insulation it helps in removing necessity of applying extra materials to achieve moisture barrier demands, reducing labor and material cost.
Continuous insulation helps building to withstand the test of time without the need to upgrade and repair
Now inside the placement of continuous insulation in the envelope is needed as follows:
- Foundation wall or slab insulation
- Insulation against sub floor
- Balcony interfaces
- On the interior of masonry wall
- Bond joist insulation
Answer:
406.140 KHz
Explanation:
Given data:
Rsig = 100 kΩ
Rin = 100kΩ
Cgs = 1 pF,
Cgd = 0.2 pF, and etc.
Determine the expected 3-dB cutoff frequency
first find the CM miller capacitance
CM = ( 1 + gm*ro || RL )( Cgd )
= ( 1 + 5*10^-3 * 25 || 20 ) ( 0.2 )
= ( 11.311 ) pF
now we apply open time constant method to determine the cutoff frequency
Th = 1 / Fh
hence : Fh = 1 / Th = 
=
= 406.140 KHz