<span><span><span>2<span>c5</span></span>+<span>44<span>c4</span></span></span>+<span>242<span>c3</span></span></span><span><span><span>2<span>c5</span></span>+<span>44<span>c4</span></span></span>+<span>242<span>c3</span></span></span><span>=<span><span><span>2<span>c3</span></span><span>(<span>c+11</span>)</span></span><span>(<span>c+11</span><span>)</span></span></span></span>
Answer:
Step-by-step explanation:
Alright, lets get started.
The probability that an event will occur is 2/3.
Means out of 3 times, 2 times that event will occur.
Please refer the pie chart for this, blue is the color which represents event to be occur and orange is not to be occur.
We can see, blue part is much more than orange part.
means the likelihood of event occuring is LIKELY. : Answer
Hope it will help :)
Answer:
T A N M B
Step-by-step explanation:
Finding the regression equation, her average speed on the 9th day should be expected to be of 6.92 minutes per mile.
<h3>How to find the equation of linear regression using a calculator?</h3>
To find the equation, we need to insert the points (x,y) in the calculator.
Researching the problem on the internet, the values of x and y are given as follows:
- Values of x: 1, 2, 3, 4, 5, 6.
- Values of y: 8.2, 8.1, 7.5, 7.8, 7.4, 7.5.
Hence, using a calculator, the equation for the average minutes per mile after t days is given by:
V(t) = -0.15143t + 8.28
Hence, for the 9th day, t = 9, hence the estimate is:
V(9) = -0.15143(9) + 8.28 = 6.92 minutes per mile.
More can be learned about regression equations at brainly.com/question/25987747
#SPJ1