The toppings would still cost 0.50 each (since it is just toppings)
The large pizza costs $18 if you do not have any toppings
The medium costs half of the large
18/2 = 9
The medium costs $9 without any toppings, so your new equation will be:
c = 0.50t + 9
hope this helps
Answer:
This means that the correct initial value problem for the population p(t) as a function of time is is 
Step-by-step explanation:
The population of a town increases at a rate proportional to its population:
This means that this situation is modeled by the following differential equation:

In which k is the growth rate.
By separation of variables, the solution is given by:

In which P(0) is the initial population.
Initial population of 1000.
This means that the correct initial value problem for the population p(t) as a function of time is is 
Answer:
0.1151 = 11.51% probability of completing the project over 20 days.
Step-by-step explanation:
Normal Probability Distribution
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the z-score of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the p-value, we get the probability that the value of the measure is greater than X.
Expected completion time of the project = 22 days.
Variance of project completion time = 2.77
This means that 
What is the probability of completing the project over 20 days?
This is the p-value of Z when X = 20, so:



has a p-value of 0.1151.
0.1151 = 11.51% probability of completing the project over 20 days.
Answer:
5√2x2
Step-by-step explanation: