1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
n200080 [17]
3 years ago
11

Which construction material can workers erect at the fastest rate?

Engineering
2 answers:
mina [271]3 years ago
7 0

Answer:

Fabrication benefits

Explanation:

Onsite construction can certainly begin more quickly when you are using concrete, stone, or brick. However, total construction time will lag behind that of building with steel. These materials require time to prepare and cure; and they result in more waste to move off site and dispose of.

miv72 [106K]3 years ago
5 0
<h2><u><em>Answer:  </em></u></h2><h2><u><em> </em></u></h2><h2><u><em>Creation benefits  </em></u></h2><h2><u><em> </em></u></h2><h2><u><em>Clarification:  </em></u></h2><h2><u><em> </em></u></h2><h2><u><em>On location development can positively start all the more immediately when you are utilizing solid, stone, or block. Notwithstanding, absolute development time will fall behind that of working with steel. These materials expect time to get ready and fix; and they bring about more waste to move off site and discard.</em></u></h2>
You might be interested in
Appliances that use force voltage analogy
Inga [223]
Answer: resistor

Explanation: Not quite sure. Need more research
5 0
3 years ago
Sandra is holding a piece of tissue that has a negative charge and a feather that has a neutral charge. The two objects have sim
Murljashka [212]
The correct answer would be d
The objects will not move towards or away from each other
Hope this helps
4 0
2 years ago
a(n) ? is an intentionally constructed, low-impedance electrically conductive path designed and intended to carry current during
tester [92]

A effective ground-fault current path  is an intentionally constructed, low-impedance electrically conductive path designed and intended to carry current during ground-fault conditions from the point of grounding on a wiring system to the electrical supply source.

<h3>Is earth an effective ground fault current path?</h3>
  • Sticking the wire in the ground is not sufficient since the earth is not thought to be a reliable ground-fault current channel.
  • The electrical system of a building or other structure is based on grounding.
  • To give a fault current a secure path to travel, grounding is used.
  • When installing switches, light fixtures, appliances, and receptacles, a complete ground route must be kept.
  • The undesired current flow trips circuit breakers or blows fuses in a system that is correctly grounded.
  • Through the use of a grounding bank, effective grounding maintains voltages within predetermined limits during a line-to-ground fault (short-circuit condition).

To learn more about ground-fault current channel  refer,

brainly.com/question/28498355

#SPJ4

5 0
1 year ago
What type of footwear protects your toes from falling objects and being crushed?
Lady bird [3.3K]

Answer:Steel toe

Explanation:

6 0
4 years ago
Read 2 more answers
Multiple Choice
hichkok12 [17]

Answer:

Geological engineers can help determine if the soil and structural stability in the building's location are satisfactory.

Explanation:

Geologic Engineering refers to a job which applies<em> geology to engineering</em>. This type of job focuses on the investigation of sites in response to<em> soil, rock </em>and <em>groundwater.</em> They help design the major structures for engineering works, thus, it is also their role <u><em>to know whether the building's soil and structural stability are satisfactory.</em></u> They determine <em>how much of the structure is a safe load for the soil it is standing upon.</em> They also test the strength of both rock and soil at different depths. This will help them know whether the location will be suitable for the skyscraper.

4 0
3 years ago
Other questions:
  • Which of the following terms involves the study of all the systems, devices, knowledge, processes, organizations, items, and peo
    11·1 answer
  • A 75-g projectile traveling at 600 m/s strikes and becomes embedded in a 50-kg block, which is initially stationary. Compute the
    9·1 answer
  • Opposition to current flow, restricts or resists current flow
    15·1 answer
  • You are out of gas in the desert and you accidently dropped your phone battery down an Abandoned oil well. You have a charged ca
    14·1 answer
  • What is the purpose of a presentation model? to fabricate a prototype to test the efficiency of the manufacturing process to tes
    15·1 answer
  • If Fred has already measured 14 inches of a table measuring 30 inches. How many inches does he need to measure more?
    15·1 answer
  • Whats a person who enters the electrical trade
    7·2 answers
  • Choose the type of alternative energy that you will advocate for. You may choose either a wind farm with an attached plant for g
    15·1 answer
  • An AM signal having a carrier frequency of 460 kHz is to be mixed with a local oscillator signal at a frequency of 1135 kHz. Wha
    11·1 answer
  • ¿Cuál es el objetivo de la participación del gobierno en la economía?
    6·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!