Answer:
The correct answer is B.
Explanation:
Gross profit equals net sales minus cost of sales(Net sales- Cost of Sales).
Net sales = $325,000
Cost of Sales = $240,500
Therefore we have;
$325,000 - $240,500
=$84,500
Gross profit ratio is (Gross profit/net sales) x 100%
($84,500 x $325,000) x 100%
26%
Answer:
D) $31.
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = Estimated manufacturing overhead ÷ estimated direct labor hours
where,
Estimated manufacturing overhead is
= Salary of factory supervisor + Heating and lighting costs for factory + Depreciation on factory equipment
= $37,600 + $22,000 + $5,600
= $65,200
And, the direct labor hours is 2,100
So, the predetermined overhead rate is
= $65,200 ÷ 2,100
= $31
Answer: Option (C) is correct.
Explanation:
Correct Option: Political business cycle
If government tax revenues change automatically and in a countercylical direction over the course of the business cycle, this would be called a Political business cycle.
These cycles are present in macroeconomic variables such inflation rate, output and unemployment. There are two types of regime follow in this cycle are as follows:
(i) Regime A consist of expansionary polices which results in a economic growth and inflation. If the inflation rate is high enough then there is a withdrawal of policy.
(ii) Regime B consist of contractionary polices which results in reducing economic growth and inflation. It will become voted out if the unemployment is too high, replaced by Regime A. It generally lead to downward movement of the cycle.
Answer:
cost of equity = 13%
Explanation:
With the info given, we will use cost of equity formula from Dividend Growth Model. THis is given by:

Where D_1 is the next year dividend or D_1 = D_0(1+g)
P_0 is current stock price
g is the growth rate
Since D_0 (dividend this year) is 4.20 and g = 6.4% or 0.064, we can calculate D_1:

Current share price is 68, so we can now calculate cost of equity:

Hence,
cost of equity = 13%
Answer:
Option d would be the appropriate choice.
Explanation:
- At either the vertices including its continuum that ranges exist the optimal solutions towards linear programming challenges. Throughout this instance, the feasible area is just the section between some of the blue as well as red sections of the green map.
- The green squares that describe the point of convergence between some of the red or green outlines seem to be the optimal solution.
Some other choices don't apply to the specified situation. So, the best one is the one mentioned.