3.12 (repeating) = 3 12/99 reduces to 3 4/33 or 103/33
if there is one number repeating, like 0.222...u put that one number over 9...making it 2/9.
if there is 2 numbers repeating, like 0.1313...u put the two repeating numbers over 99...making it 13/99
if there are 3 numbers repeating, like 0.123123...u put ur three repeating numbers over 999...making it 123/999
Answer:
A) probability that at least x of them will require repairs is less than 0.5 is 4
Step-by-step explanation:
sample size, n = 20
p = success probability of toaster = 0.2
q = failure probability of toaster =1- p = 1- 0.2 =0.8
mean, , μ = n * p = 20 * 0.2 = 4
standard deviation, 
a) the probability that at least some of them require repairs < 0.5.
for
value of z = 0
we know 
from z table
X = 4
B) SECOND PART IS INCOMPLETE { DATA IS INCOMPLETE}
Answer:
slope=2
Step-by-step explanation:
subrtract -4-(-4) the two negatives make it a + so that becomes 8 and thats for the top one the bottom is 6-2 which is 4 then divide 8 by 4 to find the slope which is 2.
Answer:
33,600
Step-by-step explanation:
length=20m
wide=14m
area= 28m²
1m= 28
cost = 120*28= rs33600 per m²