Let x=the first number
Then x+7=second number
And 4(x+7)+2=third number (2 more than 4 times the second)
Now we are told that:
x+(x+7)+(4(x+7)+2)=85 get rid of parentheses
x+x+7+4x+28+2=85 simplify
6x+37=85 subtract 37 from each side
6x+37-37=85-37
6x=48
x=8---first number
x+7=8+7=15 second number
4(x+7)+2=4*15+2=62 third number
CK
8+15+62=85
85=85
Take the co-ordinates of your triangle and add three to the Y co-ordinates and keep the X co-ordinates the same. Then, graph. The shape should have slid upwards three points.
-2a from both sides then divide by -5 and a=1
From calculus, to determine the maxima or minima of the graph, get the derivative of the equation and equate to zero. So, we derive first the equation of the graph and equate to zero.
C = 0.25x² - 80x + 30000
dC/dx = 0 = 0.5x - 80 + 0
0.5x = 80
x = 80/0.5
x = 160 units
The minimum cost (although not asked) is:
C = 0.25(160)² - 80(160) + 30000
C = $23,600
The answer is 160 units.
Answer:
$960.95
Step-by-step explanation: