Answer:
916.11 ft³
Step-by-step explanation:
(9×6)×7.83/2×13/3
= 211.41×13/3
= 916.11 ft³
Answered by GAUTHMATH
Answer:
b. the area to the right of 2
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X, which is also the area to the left of Z. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X, which is the area to the right of Z.
In this problem:




Percentage who did better:
P(Z > 2), which is the area to the right of 2.
70, 7*10 since it is 1/10 of that number
Answer:
The answer to your question is 24x³ - 46x²- 28x + 63
Step-by-step explanation:
Data
(6x² - x - 9)(4x - 7)
Process
1.- Multiply 4x by the three terms of the first polynomial
(6x² - x - 9)(4x) = 24x³ - 4x² - 36x
2.- Multiply -7 by the three terms of the first polynomial
(6x² - x - 9)(-7) = -42x² + 7x + 63
3.- Add both result
24x³ - 4x² - 36x -42x² + 7x + 63 = 24x³ - 46x²- 28x + 63
Start with hours worked 6 x $9 = 54
Then commission $700 x 0.12 (12% converted to a decimal) = $84
Add up 54 + 84 = $138 total income
So answers are A, the first C (you make $84 in commission), and the last one, you make $138 in total.